Companion files

Contract Management

What the Clauses Actually Cost, and How to Price Them Before You Sign

These are the companion files of Contract Management by Julian R. Sterling.The book on Amazon →

These are the four Excel workbooks that go with the book. Larchmere Industrial ran a competitive tender, received two bids, and signed the cheaper one: 104.00 a unit against 109.50, a gap of 5.50 worth 1,228,920.00 over three years on the business case volumes. The price did hold. What the approval paper never priced was the paper the price came attached to. The eight clauses that differ between the two agreements cost 1,565,906.48, the realised price saving was 87,304.04, and the net position against the bid that was rejected is −1,478,602.44. That is a swing of 2,707,522.44 against the approved case, and 94.68 per cent of it was knowable on the day of signature. The signed price path crosses the rejected bid’s in month nineteen, which is inside the term. Every figure the book prints is reproduced here by a live formula rather than a typed constant, and each workbook ends with a Checks sheet setting the printed figure beside the computed one: 108 checks in all, every one passing. Revised on 24 September 2026: the counterfactual sheet the first version announced and did not contain is built, and it corrects the book on one point (three clauses reach +21,103.79, not +31,230.95). Around the workbooks: the same four with the inputs emptied, thirteen working documents to print, forty questions that mark themselves, and three cases the book names and never takes to a number.

Free to download. No sign-up, no email address, nothing to fill in.

Everything on this page, in one archive

Download the ZIP275 KB

Twelve workbooks, the printable documents and the read-me. Each group below can also be downloaded on its own. Last revised 24 September 2026.

Get an email if these files are corrected

Optional. When a workbook on this page is corrected or a new worked case goes up, readers on the list get one email, plus a short note when a new book comes out. The downloads do not need it.

Join the reader list

Run by MailerLite, off this site. How your address is used.

The four workbooks

These carry the book’s own figures, so that every number it prints can be traced to a live formula. Each closes on a checks sheet that ends ALL OK. Download these four103 KB

The same models, for your own contract

The four workbooks with every input emptied. The checks sheets count what is still missing and test what holds for any inputs.

The documents the chapters describe

Thirteen pages to print and use. A4, with margins wide enough for US Letter.

Forty questions, marked by the file

A workbook that marks itself. Answer in the yellow cells; the marking fills in as you go.

Three cases the book does not work

New material, not a restatement. Three situations the chapters name and never take to a number. Each case is one workbook: the note is the first sheet, the model is the rest, and a checks sheet closes it.

Conventions used throughout

Blue textan input: change it and everything recomputes
Yellow fillan assumption that decides the answer rather than merely feeding it: the six operational rates, the low case volume that prices every threshold in the agreement, and the annual cap on the alternative. In the third workbook every input cell carries the fill, because on a contract not yet signed every one of them is an assumption somebody is making
Black texta formula: do not overtype these
Grey texta note
Green texton the Checks sheet, the published figure being checked against
Checks sheetthe printed figure beside the computed one, the difference, and a PASS or a FAIL; the foot of the sheet reads ALL OK
ADDEDa figure the book does not give, used in the cases and marked wherever it appears

There are no macros, no external links, no protection and no circular references anywhere, and nothing is locked or watermarked. The files behave identically in Excel, LibreOffice and Google Sheets.

Why the checks matter more than the models

A workbook that agrees with a book proves nothing on its own, since the author wrote both. What the Checks sheets do is different: they force the model to reproduce a number that was printed before the model existed, from a formula rather than from the number itself. 108 checks across the four files, being 39, 22, 25 and 22, all passing.

On this book the discipline earns its keep twice. The first time is on rounding. The model rounds at each step, as any contract administrator would, and a workbook that compounds at full precision produces figures that are defensible, different, and wrong against the printed page. Fourteen checks failed on the first build for that reason alone, and the fix was to make every formula round where the model rounds rather than to widen the tolerance.

The second time is on double counting. Indexation is worth 892,881.88 over the term and it appears nowhere in the 1,565,906.48 clause package, because its effect is already inside the price gap the bridge starts from. Adding it would produce a larger, more impressive and entirely false number. The workbooks display it, label it, and refuse to sum it, and a check holds the clause package to the seven lines that belong in it.

The third time is on interaction. Cap the index and the contract price falls, so every clause that multiplies the price moves with it: the band, the currency, the payment terms and the premium paid for spot units during the force majeure. The book recomputed the first three and held the fourth, and overstated the cap by 10,127.16. The counterfactual sheet recomputes all four, and a check says so.

The assumptions most worth arguing with are the two index paths and the low case volume. Move the annual cap on the alternative from nothing to 3.00 per cent and the cost of the indexation clause falls from 892,881.88 to 354,572.71, a saving of 538,309.17 which is 3.3708 a unit and the single most valuable thing nobody asked for. Move the volume band threshold from 55,000 down below your own low case and 514,263.68 of surcharge disappears. Type your own figures instead and watch which answers move and which do not.

Go beyond the companion files

Contract Management develops the complete framework behind these models, with the assumptions, trade-offs and worked examples tied together.

View the book on Amazon Read the related analysis

Opening the files

The workbooks open in Microsoft Excel, LibreOffice Calc, Google Sheets and Numbers; the PDF prints on A4 or US Letter. They use no macros and no add-ins, so nothing needs to be enabled or trusted. If your spreadsheet asks to update links on opening, decline, because there are none.

What changed, and when

24 Sep 2026The four workbooks corrected; 108 checks. The counterfactual sheet of Chapter 17 built: three clauses reach +21,103.79, not +31,230.95, and the best single fix leaves −901,798.46, not −891,671.30. Chapter 16’s scenarios and twenty per cent test added. The draft-contract calculator no longer uses the low case as the band threshold; the trade planner’s verdict corrected. Added: a blank set, thirteen working documents, forty questions that mark themselves, and three cases.

Articles on this book

Also by Julian R. Sterling

The other books with companion files. The full list of titles is on the author page.

If this book helped — or didn’t — a few lines on Amazon are worth more than they look: they are what the next reader goes on. Write a review. The workbook stays free either way.